


The second half of a three phase project, the Training Tower was constructed on a pre-graded site on the Emergency Training Services complex. Stewart Cooper Newell Architects worked in conjunction with the owner's representative to provide economical training aides, including elevator doors and shafts, vertical and horizontal confined space drills, electrical panel and valve lockout props, and floor, wall and ceiling tie-offs on all levels. The structure melds both external stairs and includes stairs for smoke generators.